









A regional infrastructure authority launched a major initiative to expand gas distribution networks. The project required sourcing reliable, high-capacity corrugated HDPE pipe production to meet growing demand from municipal and industrial clients in the region.
A local pipe manufacturer identified the need for a dedicated production line capable of delivering 1,200+ linear meters of corrugated pipe per shift, maintaining consistent quality and durability in extreme temperature conditions.
The operations team evaluated three production line suppliers, focusing on:
After evaluating production line options, the team selected the SL600 for its proven reliability in similar climates, modular design, and strong regional support network.
Contract signed in March 2024 for one SL600 unit with optional mill extension. Total investment: €185,000. The manufacturer committed to annual capacity of 100,000+ linear meters of corrugated pipe for municipal and industrial applications.
Suba shipped the unit in July 2024. Installation took 3 weeks, with two Suba technicians on-site for machine setup and operator training. The local team completed a 2-week intensive certification course.
The line has been in continuous operation since Q3 2024, producing 1,250 m/shift of 300–600mm corrugated HDPE pipe. Quality metrics:
| Metric | Target | Actual |
|---|---|---|
| Daily Output | 1,200 m | 1,250 m |
| Defect Rate | <0.5% | 0.2% |
| Corrugation Depth | 10–12mm | 11.2mm ±0.3mm |
| Wall Thickness | ±0.4mm | ±0.2mm |
| Uptime | 90% | 94% |
The manufacturer has already expanded to a second SL600 unit based on success.
"The Suba SL600 has become the backbone of our operation. We're now supplying municipal authorities across the region and neighboring countries. The machine's reliability and the Suba team's support made this investment one of the best decisions we've made." — Plant Manager
















Interested in this machine?
Interested in the SL600? Contact us for specifications and pricing.
Request SL600 Specs

How a regional city sewage authority replaced aging clay pipes by procuring Suba's SL600 high-speed PP double-wall corrugated pipe production line — from first contact to full operation.


How an East African national road authority sourced a Suba SL300 production line to manufacture ID 300mm HDPE corrugated drainage pipes for 450 km of new highway — covering procurement, commissioning, and results.


A Central European telecom contractor producing OD 110mm HDPE corrugated cable protection pipes for a national fiber network chose Suba's SL110 line. Full case study: technical spec, order, delivery, and 2 years of production.
Contact us for a free consultation and quote