A national fiber broadband rollout required laying fiber-optic cable across rural and suburban zones. A local construction contractor won a multi-year framework agreement to install conduit — OD 110mm HDPE double-wall corrugated pipe — across 12 provinces.
The volumes were substantial: estimated 40 million meters over 4 years. At those quantities, importing finished pipe was not viable. The contractor decided to invest in in-house production.
The contractor's operations manager evaluated five production line suppliers over three months. The SL110 was selected for the following reasons:
Contract signed in November 2021. The specified configuration:
The coiler and packaging unit were a Suba custom option, enabling the contractor to deliver pre-coiled 50m drums directly to installation crews — eliminating an intermediate packaging step.
Lead time: 10 weeks from contract to FAT at Qingzhou.
2×20ft containers, Qingdao to the destination port, 28-day transit. The contractor arranged truck delivery to their facility. No customs surprises — Suba's documentation team prepared all CE declarations and packing lists in English and local language.
Suba sent one mechanical engineer and one electrical/PLC specialist for the 10-day commissioning visit.
Highlights:
The line has been in continuous operation since Q1 2022. The contractor now runs 3 shifts, 5 days per week:
| Metric | Value |
|---|---|
| Annual production | ~23 million meters |
| Average output | 205 kg/h per shift |
| Coil reject rate | <0.3% |
| Unplanned downtime | <1.5% |
In 2023 the contractor added a second SL110 line from Suba to meet increased order volume, bringing total annual capacity to 46 million meters.
Suba's remote diagnostics module has resolved two PLC issues without requiring an on-site visit — a significant saving given international travel logistics.
*"The second line was an easy decision. The first line ran 22 months without a single major breakdown. When we need spare parts, they arrive in 5 days. Suba is a reliable long-term partner."*
— Operations Manager, Infrastructure Division


Interested in this machine?
Running a cable protection or conduit production project? The SL110 is built for high-speed OD 110mm output.
Request SL110 Specs

How a regional city sewage authority replaced aging clay pipes by procuring Suba's SL600 high-speed PP double-wall corrugated pipe production line — from first contact to full operation.


How an East African national road authority sourced a Suba SL300 production line to manufacture ID 300mm HDPE corrugated drainage pipes for 450 km of new highway — covering procurement, commissioning, and results.


Suba Machinery at CHINAPLAS 2021 in Shenzhen — our corrugated pipe extrusion showcase at Asia's leading plastics rubber exhibition with live demos and client meetings.
Contact us for a free consultation and quote